St Mary’s WWTP – Northern Slabs

Name:

St Mary’s WWTP – Northern Slabs

Client:

Sydney Water

Value:

$9.4m

Scope:

All civil works associated with Biosolids Stream upgrade

  • Install piles for structures
  • Install Water, Power, Comms, Sludge, Drainage and various chemical lines under the structures
  • Install foundations & footings for:
    • Sludge Screening Facility
    • Pre-dewatering building
    • Pre-dewatering FAT tanks
    • Thermal Hydrolysis Feed Facility
    • THP Silo
    • Waste Gase Burner
    • Electrical transformer & switch room
  • Supply & install structural steel
  • Reinstate

Challenges:

  • Working inside an operating treatment plant,
  • Liaising with plant operators for shutdowns & tie-ins to ensure the plant remained operational
  • Services locating to ensure existing infrastructure was not impacted.

Material:

  • Over 3500m3 of concrete
  • Over 500t of reinforcing steel
  • Numerous Water, Power, Comms, Sludge, Drainage and various chemical lines

Status:

Finished