St Mary’s WWTP – Methanol Plant

Name:

St Mary’s WWTP – Methanol Plant

Client:

Sydney Water

Value:

$500k

Scope:

All works associated with constructing a new methanol facility

  • Install & connect temporary sugar dosing equipment
  • Excavate for & install new double skinned tank with vacuum cavity
  • Install Water, Power, Comms, Drainage and various chemical lines under the structures
  • FRP chemical bund and unloading bund.
  • Construct structural steel canopy over bund
  • Install chemical dosing skids
  • Connect dosing skids to tank and treatment plant network
  • Reinstate

Challenges:

  • Working inside an operating treatment plant,
  • Liaising with plant operators for shutdowns & tie-ins to ensure the plant remained operational
  • Services locating to ensure existing infrastructure was not impacted.
  • Working with chemicals
  • Maintaining vacuum seal on tank.

Status: