$2.1m

Scope:

All civil works associated new wet well and screening structure

  • Install secant piles for structures
  • Excavate 9m deep inside pile wall
  • Manage water in highly charged ground conditions
  • FRP wet well & screenings structure
  • Cast pre-cast roofs up to 30t and place.
  • Reinstate

Challenges:

  • Working inside an operating pump station
  • Water table was 2m below surface.
  • The screenings structure was built over a live DN1500 incoming line, which had to be protected at all times.
  • Through using vacume spears and sump pumps, we had to keep the excavations de-watered at all times
  • The ground water was PASS – Acidic – so had to be treated and neutralized.
  • We had to remove 1200t of ACM spoil from the excavations.
  • The overflow pipe & headwall were going into a natural waterway so had to work in very strict EPA guidelines.

Status:

Finished